December 22, 2007: fitting plasterboard strips

Saturday, December 15, 2007

Multiple Myeloma More Condition_symptoms

December 15, 2007: partitions Interior (end)

Show

Living

overlooking the kitchen door
cooking

overlooking the chamber floor

entry



chamber floor

with its own bathroom ...


Monday, December 10, 2007

Jcb 532-120 Telehandler Statistics

December 10, 2007: interior partitions

The walls upstairs are now asked: it remains to finalize those of the ground floor.

Today we were finally able to realize the volume of parts: it's better than what we imagined!

The electrician must be made next week. We should take possession in March 2008.

























Monday, November 19, 2007

Used Opti Sailboats For Sale In Detroit

November 19, 2007: insulation of the floor

The insulation of the floor is almost complete (3 weeks of work anyway): Remains partitions and doors to ask (2 or 3 days required).

In parallel, the developer began the work of connecting dry (EDF, Telecom, etc.) where the trench visible on the picture below.



















Monday, November 12, 2007

Brazilian Camper For Sale

November 10, 2007: flaps raised

The flaps are sealed. The work of interior insulation and installation of partitions have begun (photos will follow).





And as always at the house site! the SHAME!