November 19, 2007: insulation of the floor
The insulation of the floor is almost complete (3 weeks of work anyway): Remains partitions and doors to ask (2 or 3 days required).
In parallel, the developer began the work of connecting dry (EDF, Telecom, etc.) where the trench visible on the picture below.
The insulation of the floor is almost complete (3 weeks of work anyway): Remains partitions and doors to ask (2 or 3 days required).
In parallel, the developer began the work of connecting dry (EDF, Telecom, etc.) where the trench visible on the picture below.