Monday, November 12, 2007

Brazilian Camper For Sale

November 10, 2007: flaps raised

The flaps are sealed. The work of interior insulation and installation of partitions have begun (photos will follow).





And as always at the house site! the SHAME!

Saturday, October 20, 2007

Traditional Lobsterboat Plans

October 20, 2007: The windows are installed!