House Built By Babeau Seguin 21
Monday, November 12, 2007
Brazilian Camper For Sale
November 10, 2007: flaps raised
The flaps are sealed. The work of interior insulation and installation of partitions have begun (photos will follow).
And as always at the house site! the SHAME!
Saturday, October 20, 2007
Traditional Lobsterboat Plans
October 20, 2007: The windows are installed!
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)