Saturday, June 23, 2007

Small Propellor Hire Boats

June 23, 2007: The DRC is finished!









Thursday, June 21, 2007

Fredericton Car Auction

June 20, 2007: Elevated ground floor walls (end)

Superb progress masons: 6 days to climb the walls of the ground floor!

The front ...



The back








left the shed, amidst the kitchen door and right-living room window




The lounge and living room (bottom)



kitchen door



Cross-sectional view of the stay. At the back of the room, left the main entrance opposite the kitchen.



view room on first floor, with the substance delivery



side stay

Sunday, June 17, 2007

Guidelines For The Strongest Wood Cube Possible

June 17, 2007: Elevation of the walls of the DRC (continued)

Frontage





Rear facade



Interior Photos









Thursday, June 14, 2007

Usb Grabber Vc-211a Driver

June 14, 2007: Elevated walls CDR



After 5 weeks of drying of the slab, the walls are finally live up ...
Here is the result of two days of work in the rain ... not bad!



Entry




Rear View




View of lounge (south)